S.N. Project Name Location Started Ended Total No of Drill Holes Total Drilling Depth (m) Max, Drilling Depth (m) Remarks
1 Ankhu Khola Hydropower Project Dhading March 2025 May 2025 6 130 20 Geotechnical Investigation Works
2 Upper Karnali Hydroelectric Project (900 MW) Dailekh – Achham February  2025 May 2025 3 268 130
3 Daraudi Nadi Hydropower Project 9.84 MW (PRoR-6 hours) Gorkha District, Nepal December 2022 Jan-23 7 122 22
4 Betan Karnali Electric Project (688 MW) Acham District November2018 July 2020 9 744 120 DPR,
5 Kimathanka Arun Electric Project (450MW) Sankhuwashaba District June 2018 January 2021 16 1525 180 DPR,
6 Super Tamor Hydroelectric Project (155MW) Taplejung District April 2018 November 2019 7 155 40 Feasibility Study
7 400 kV Double Circuit Transmission Line Project Eastern and Central Nepal January  2019 August 2019 60 420 7 Feasibility Study
8 Grid Solar and Energy Project Battar, Trishuli September 2018 July 2019 10 50 5 Geotechnical Investigation
9 Solu Khola Dudhkoshi HEP (86MW) Solukhumbu May 2016 November 2016 5 335 150 DPR, one incline hole 60º of 25 m
10 Rasuwagadi HEP Rasuwa May 2016 August 2016 6 263.4 64 Drilling at headworks
11 Middle Modi HEP Parbat April 2016 June 2016 2 103.8 68 Conformation of tunnel alignment, MASW
12 Sun Koshi Marin Diversion Project (39MW) Ramechhap/Sindhuli November2014 December 2015 12 420 70 Detail feasibility
13 Super Trishuli Hydropower Project (80MW) Chitwan / Gorkha September 2014 November 2014 2 96 53 DPR
14 Solu Khola Dudh Koshi Hydroelectric Project (86MW) Solukhumbu March 2013 September 2013 6 168.2 50 Feasibility Study
15 Super Trishuli Hydroelectric Project (80MW) Chitwan / Gorkha September 2012 Marcj  2013 15 430.5 47 DPR
16 Lapchi Hydroelectric Project (160MW) Dolakha May 2012 Aug 2012 10 275 50 DPR
17 Tamakoshi I  Hydroelectric Project (100MW) Ramechhap June 2011 September 2011 8 435 80 DPR
18 Likhu IV Hydroelectric Projects (120MW) Okhaldhunga March 2011 July 2011 6 397 70 Detail design
19 Lower Solu Hydropower Project (82 MW) Solukhumbu December 2010 May 2011 8 272 84 DPR
20 Super Trishuli  Hydroelectric Project (80MW) Chitwan August 2010 October 2010 4 125 64 Feasibility Study
21 Likhu 1 Hydroelectric Project (77 MW) Solukhumbu November 2009 July 2010 8 275 130 DPR
22 Likhu 2  Hydroelectric Project (55 MW) Solukhumbu  

December 2008

 

December 2009

6 165 75 DPR
23 Likhu A  Hydroelectric Project (51 MW) Solukhumbu 8 275 100 DPR
24 Upper Karnali Hydroelectric Project (900 MW) Dailekh – Achham 22 709 54 DPR
25 Likhu IV Hydroelectric Project (120 MW) Okhaldunga May 2008 August

2008

6 374 100 DPR