S.N. Project Name Location Client Date Work Accomplished
1 Soil Investigation for Preparatory survey on the project for improvement of aviation safety facilities in major airport, Chandragadi, Janakpur, Dhangadi Jhapa/ Dhansua/Dhangadi JICA/CEMAT 5/1/2015
6/1/2015
In situ and laboratory testing for geotechnical and engineering parameters along the runway of the respective airports
2 Air Transports Capacity Enhancement Project Tribhuvan International Airport Kathmandu JICA/San Jose 11/1/2014
1/1/2015
DTH drilling for grout filling of the earlier drainage system as a part of airport extension project
3 Nepal India Regional Trade and Transport Project Detailed Subsurface Investigation Birgunj and Bhairahawa Nepal India regional trade and transport Project (NIRTTP) 10/1/2014
12/1/2014
Soil and insitu testing and determination of geotechnical parameters for the proposed dry port
4 Detailed sub-surface investigation for Sanitary Landfill site, Idiyahi and Bishrampur VDC in Bara district and Sewerage treatment plant site, Ward No 1, Birgunj Sub-Metropolitant City Bara, Birgunj Birjung Sub-Metropolitan City 3/1/2013
4/1/2013
Drilling and soil testing of sewage treatment plant and land fill site, installation of stand pipe for peizomenter, test pitting, sampling and laboratory testing for geotechnical and engineering parameters
5 Australian Embassy Building Construction Kathmandu Australian Embassy 12/1/2007
2/1/2008
Soil investigation laboratory testing for geotechnical paramaters for foundation design
6 New Royal Norwegian Embassy Chancellery Building Iconstruction Kathmandu Norwegian Embassy 1/1/2006
3/1/2006
Soil investigation laboratory testing for geotechnical paramaters for foundation design
7 Bulk Distribution Mains of Melamchi Water Supply Development Project Kathmandu Valley Lahmeyer International / Mott Mac Donald Ltd/ MWSD and Association with Nepal Electricity Authority (NEA) 11/1/1999
2/1/2000
Site investigation (geology) and drilling works