S.N |
Project Name |
Location |
Client |
Date |
Work Accomplished |
1 |
Betan Karnali Electric Project (688 MW) |
Acham District |
NEAEC |
11/1/2018 7/1/2020 |
Exploratory core drilling (a total of 744.00m, max depth 120.00m) |
2 |
Kimathanka Arun Electric Project (450MW) |
Sankhuwashaba District |
NEAEC |
6/1/2018 1/1/2021 |
Exploratory core drilling vertical and inclined, geological and engineering geological mapping, construction material survey, laboratory testing and analysis. (total 1525m, max 180.00m) |
3 |
Super Tamor Hydroelectric Project (155MW) |
Taplejung District |
Crystal Power Development Pvt. Ltd. |
4/1/2018 11/1/2019 |
Exploratory drilling, geological and engineering geolocical mapping construction material survey and laboratory test and analysis |
4 |
400 kV Double Circuit Transmission Line Project |
Eastern and Central Nepal |
Stantec Inc., USA |
1/1/2019 8/1/2019 |
Geological and enginnering geological mapping, drilling and testing at substation and transmission tower, geophysical investigation (ERT and SP) |
5 |
Grid Solar and Energy Project |
Battar, Trishuli |
RISEN Energy Co. Ltd. |
9/1/2018 7/1/2019 |
Ground improvement, soil testing, laboraoty testing and anlaysis |
6 |
Solu Khola Dudhkoshi HEP (86MW) |
Solukhumbu |
Hydro Venture Pvt. Ltd. |
5/1/2016 11/1/2016 |
Exploratory drilling, geological and engineering geolocical mappind construction material survey and laboratory test and analysis |
7 |
Rasuwagadi HEP (111 MW) |
Rasuwa |
China International water and Electric Corp. |
5/1/2016 8/1/2016 |
Exploratory drilling (total of 168.00m linear depth, max 64.00m) |
8 |
Solu Khola Dudh Koshi Hydroelectric Project (86MW) |
Solukhumbu |
Hydro Venture Pvt. Ltd. |
3/1/2013 9/1/2013 |
Exploratory drilling, geological and engineering geolocical mapping construction material survey and laboratory test and analysis |
9 |
Super Trishuli Hydroelectric Project (80MW) |
Chitwan / Gorkha |
Blue Energy Pvt. Ltd |
9/1/2014 11/1/2014 |
Exploratory drilling, geological and engineering geolocical mapping, construction material survey and laboratory test and slope stability analysis |
10 |
Lapchi Hydroelectric Project (160MW) |
Dolakha |
NASA Hydropower (P) Ltd. |
5/1/2012 8/1/2012 |
Feasibiligy study, Geological mapping |
11 |
Tamakoshi I Hydroelectric Project (100MW) |
Ramechhap |
Satyam Urja Pvt. Ltdl |
6/1/2011 9/1/2011 |
Exploratory drilling |
12 |
Likhu IV Hydroelectric Projects (120MW) |
Okhaldhunga |
Green Venture (P) Ltd |
3/1/2011 7/1/2011 |
Geological and geotechnical investigation drilling works at headworks, surge tank and power house site |
13 |
Lower Solu Hydropower Project (82 MW) |
Solukhumbu |
Essel-Clean Solu Hydropower Pvt. Ltd. |
12/1/2010 5/1/2011 |
Exploratory drilling, Geological and enfgineering geological mapping, construction material survey, Laboratory testing and analysis |
14 |
Likhu 1 Hydroelectric Project (77 MW) |
Solukhumbu |
Pan Himalayan Energy (P) Ltd. |
11/1/2009 7/1/2010 |
Exploratory drilling, Geological and engineering geological mapping, construction material survey, Laboratory testing and analysis |
15 |
Likhu 2 Hydroelectric Project (55 MW) |
Solukhumbu |
|
11/1/2009 7/1/2010 |
Exploratory drilling, Geological and engineering geological mapping, construction material survey, Laboratory testing and analysis |
16 |
Likhu A Hydroelectric Project (51 MW) |
Solukhumbu |
Numbur Himalay Hydropower (P) Ltd. |
11/1/2009 7/1/2010 |
Exploratory drilling, Geological and engineering geological mapping, construction material survey, Laboratory testing and analysis |
17 |
Upper Karnali Hydroelectric Project (900 MW) |
Dailekh - Achham |
GMR |
12/1/2008 12/1/2009 |
Exploratory core drilling, in situ testing,derivation of soil/rock engineering properties |